| Amount | Fermentable | Cost | PPG | °L | Bill % |
|---|---|---|---|---|---|
| 4 kg | ZA - Pale Malt |
R 26.54 / kg R 106.15 |
30.8 | 2.02 | 60.6% |
| 1 kg | Flaked Oats | 33 | 2.2 | 15.2% | |
| 400 g | Weyermann - German - CARABELGE |
R 23.80 / kg R 9.52 |
34 | 13.6 | 6.1% |
| 200 g | DE - Carapils |
R 43.33 / kg R 8.67 |
35 | 1.3 | 3% |
| 1 kg | Weyermann - Vienna Malt |
R 31.83 / kg R 31.83 |
37 | 3.5 | 15.2% |
| 6.60 kg / R 156.17 | |||||
| Amount | Variety | Cost | Type | AA | Use | Time | IBU | Bill % |
|---|---|---|---|---|---|---|---|---|
| 60 g | Yakima Chief Hops - Azacca |
R 0.83 / g R 49.80 |
Pellet | 10.7 | Boil | 10 min | 19.86 | 19% |
| 40 g | Yakima Chief Hops - Mosaic |
R 1.12 / g R 44.80 |
Pellet | 12 | Boil at 77 °C | 10 min | 14.85 | 12.7% |
| 40 g | Yakima Chief Hops - Azacca |
R 0.83 / g R 33.20 |
Pellet | 10.7 | Whirlpool at 80 °C | 20 min | 4.91 | 12.7% |
| 35 g | Calypso |
R 0.89 / g R 31.15 |
Pellet | 14.6 | Whirlpool at 80 °C | 20 min | 5.87 | 11.1% |
| 20 g | Yakima Chief Hops - Azacca |
R 0.83 / g R 16.60 |
Pellet | 10.7 | Dry Hop at 18 °C | 2 days | 6.3% | |
| 70 g | Yakima Chief Hops - Citra |
R 1.98 / g R 138.60 |
Leaf/Whole | 12.3 | Dry Hop at 18 °C | 3 days | 22.2% | |
| 50 g | Yakima Chief Hops - Centennial |
R 0.87 / g R 43.49 |
Pellet | 9.7 | Dry Hop at 18 °C | 3 days | 15.9% | |
| 315 g / R 357.63 | ||||||||
| Amount | Description | Type | Start Temp | Target Temp | Time |
|---|---|---|---|---|---|
| 26.5 L | Strike | 69 °C | 65 °C | 60 min | |
| Mash Out | Temperature | 65 °C | 75 °C | -- | |
| 12.27 L | Sparge | 76 °C | 76 °C | 15 min | |
|
Starting Mash Thickness:
2.5 L/kg Starting Grain Temp: 18 °C |
|||||
| Lallemand - Verdant IPA | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
||||||||||||||||
| R 0.00 |
| CO2 Level: 4.04 Volumes |
| Cost R | Cost % | |
|---|---|---|
| Fermentables | R | |
| Steeping Grains (Extract Only) |
R | |
| Hops | R | |
| Yeast | R | |
| Other | R | |
| Cost Per Barrel | R 0.00 | |
| Cost Per Pint | R 0.00 | |
| Total Cost | R 0.00 |