Brew your best beer EVER. Start your Free Trial of Brewer's Friend today! Sign Up ×

Behind Schedule IPA

265 calories 24.1 g 330 ml
brewer logo

Like this recipe?

Save this Recipe →Free account · keep it in your recipe box
Beer Stats
Method: All Grain
Style: American IPA
Boil Time: 60 min
Batch Size: 22 liters (fermentor volume)
Pre Boil Size: 29 liters
Pre Boil Gravity: 1.066 (recipe based estimate)
Post Boil Gravity: 1.086 (recipe based estimate)
Efficiency: 75% (brew house)
Calories: 265 calories (Per 330ml)
Carbs: 24.1 g (Per 330ml)
Created: Thursday March 30th 2023
Similar Recipes

Padawan Nectar

by Beer'd Brewing Co

OG: 1.074 FG: 1.014 ABV: 7.9% IBU: 53

Jeet hop do

by richard_mcateer

OG: 1.065 FG: 1.011 ABV: 7.3% IBU: 67

1.086
1.017
9.1%
57.9
4.7
n/a
n/a
 
Fermentables
Amount Fermentable Cost PPG °L Bill %
7 kg Crisp Malting - Extra Pale Ale Malt7 kg Extra Pale Ale Malt 38 1.7 87.5%
1 kg Weyermann - Oak Smoked Wheat Malt1 kg Oak Smoked Wheat Malt 38 2 12.5%
8 kg / $ 0.00
 
Hops
Amount Variety Cost Type AA Use Time IBU Bill %
75 g Artisan - Amarillo75 g Amarillo Hops Pellet 7.7 Boil 60 min 57.89 100%
75 g / $ 0.00
 
Other Ingredients
Amount Name Cost Type Use Time
1.70 L Apple juice Other Boil 0 min.
 
Yeast
Imperial Yeast - A44 Kveiking
Amount:
1 Each
Cost:
Attenuation (avg):
80%
Flocculation:
Low
Optimum Temp:
24 - 36 °C
Starter:
No
Fermentation Temp:
21 °C
Pitch Rate:
0.35 (M cells / ml / ° P) 159 B cells required
$ 0.00 Yeast Pitch Rate and Starter Calculator
Priming
CO2 Level: 2.25 Volumes
 
Target Water Profile
Balanced Profile
Ca+2 Mg+2 Na+ Cl- SO4-2 HCO3-
0 0 0 0 0 0
Mash Chemistry and Brewing Water Calculator
"Behind Schedule IPA" American IPA beer recipe by Lassefuckingskov. All Grain, ABV 9.08%, IBU 57.89, SRM 4.67, Fermentables: (Extra Pale Ale Malt, Oak Smoked Wheat Malt) Hops: (Amarillo) Other: (Apple juice)
Brewer's Friend Logo
Last Updated and Sharing
 
398
Views
0
Brews
Recipe QR Code
  • Public: Yup, Shared
  • Last Updated: 2023-04-07 12:33 UTC
Discussion about this recipe:
You must be logged in to add comments.

If you do not yet have an account, you may register here.

Back To Top