- Joined
- Jun 28, 2019
- Messages
- 790
- Reaction score
- 1,277
- Points
- 93
Hi All,
Cooling question: Do you worry about how long it takes to cool to pitching temp after the boil?
I have a heat exchanger and it will do the job in 30 minutes but the waste water from that is ridiculous; probably 50 gallons for a full boil. I also have a cooling loop but when I use that it can take hours, I think last time 6 hours or so. I would much rather do that because there's little waste but is there a downside to it taking that long?
Thanks for help
				
			Cooling question: Do you worry about how long it takes to cool to pitching temp after the boil?
I have a heat exchanger and it will do the job in 30 minutes but the waste water from that is ridiculous; probably 50 gallons for a full boil. I also have a cooling loop but when I use that it can take hours, I think last time 6 hours or so. I would much rather do that because there's little waste but is there a downside to it taking that long?
Thanks for help
 
         
                 
				 
 
		
 
 
		
 
 
		 
 
		 
 
		 
			 
 
		 
 
		 
			 
						 
						