Who makes commercial RIMS tubes with element included? I know what I want and should probably built it except that I don't need another project right now; I do need to make a Christmas list.
I'm about to kick my Mash&Boil through the wall with all the E4 faults and constant scorching that gets harder to clean each batch. Brew days aren't supposed to be 12 hours long.
I'm about to kick my Mash&Boil through the wall with all the E4 faults and constant scorching that gets harder to clean each batch. Brew days aren't supposed to be 12 hours long.