Hi All,
Cooling question: Do you worry about how long it takes to cool to pitching temp after the boil?
I have a heat exchanger and it will do the job in 30 minutes but the waste water from that is ridiculous; probably 50 gallons for a full boil. I also have a cooling loop but when I use that it can take hours, I think last time 6 hours or so. I would much rather do that because there's little waste but is there a downside to it taking that long?
Thanks for help
Cooling question: Do you worry about how long it takes to cool to pitching temp after the boil?
I have a heat exchanger and it will do the job in 30 minutes but the waste water from that is ridiculous; probably 50 gallons for a full boil. I also have a cooling loop but when I use that it can take hours, I think last time 6 hours or so. I would much rather do that because there's little waste but is there a downside to it taking that long?
Thanks for help